Skip to main content

Data Retention and Preserved Analytics

CheckInOS's retention policy requires identifying attendee data to be removed or anonymized one calendar year after an event ends, subject to documented organizer instructions and applicable lawful retention requirements. The aim is to preserve useful group-level event reports without retaining a permanent guest list or individual attendance history.

Current implementation

Automatic attendee removal is being introduced in stages. This branch includes reports that read archived results and restricted internal maintenance routines to freeze an event, preserve reviewed aggregates and remove source data in batches. It does not enable an automatic attendee-removal schedule or send advance-retention notices. Installing these routines does not start removal; there is no organizer-facing control to invoke them.

Deleting an individual attendee in the dashboard is currently a soft delete: identifying fields may remain. For a verified full-erasure request, contact the organizer or CheckInOS support. These implementation limits do not extend existing retention obligations.

What remains useful after retention​

The archive is designed to preserve group-level reports such as:

  • Total registrations, attendance and no-shows.
  • Appropriate ticket-type totals and historical revenue calculations.
  • Registration and attendance charts over time.
  • Other reviewed, non-identifying group statistics supported by the report.

Event and report IDs can remain so the organizer can reopen an event's aggregate reports. Original attendee IDs and an original-to-replacement ID mapping are not part of the preserved archive.

Some detail must disappear. A recent-arrivals feed identifies individual activity and is not a preserved group report. Small groups, precise time buckets, custom fields and tracking labels can also identify people. These must be omitted, grouped more broadly or suppressed where necessary. Retention does not mean every existing filter or breakdown can remain at its original level of detail.

The initial archive format deliberately omits raw UTM values and original ticket labels; archived ticket breakdowns use generic group labels.

Small groups​

Small groups are suppressed rather than preventing retention. A count is publishable if it is 0 or at least 5, and so is its complement (the same rule, k=5, applies to both sides of a split).

  • An event with fewer than 5 registrations, including 0, publishes a minimal "too small to report" archive. Its attendee records are still removed.
  • Larger events withhold only the sections that would expose small groups: attendance split, invitation split, weekday chart, ticket groups, revenue, and registration or check-in timeline points. Each withheld section shows "Not available — too few attendees to report safely". Dashboard and mobile scalar counts read 0 when withheld; the web report shows "—".
  • Sparse feedback questions are suppressed the same way: no distribution or average, and the response count is hidden when it is 1–4.
  • An event goes to privacy review only for malformed feedback aggregates, non-opaque choice keys or invalid ticket configuration. Cohort size alone never blocks retention.

A withheld section is not a report with zero attendees.

Planned removal procedure​

The following procedure describes the planned activated system, not a schedule already running in this release.

  1. Advance notice. The organization's owners and administrators receive a minimal service notice by email at least 30 days before removal. It states the affected event, the removal date, what will be removed and what analytics will remain. The notice does not include an attached attendee list. Removal takes place on the later of one year after the event ends or 30 days after the notice.
  2. Secure export opportunity. Before the cutoff, an authorized organizer can sign in and explicitly export permitted event data. Permissions are checked when the export is requested. Temporary export files and links expire by the cutoff.
  3. Aggregate archive. CheckInOS preserves the supported, reviewed group statistics before removing their source records. Reports switch to that archive so they do not become empty merely because attendees have been removed.
  4. Attendee-level removal. The process removes identifying attendee records, granular check-in/check-out history and related recipient-level data within the retention scope. Feedback response-level retention is coordinated with its own cleanup.
  5. Completion checks. The process verifies that the in-scope source records are gone before marking the event complete. Failed or interrupted work is retried and must remain visible as unfinished.

Notices for events that are not yet overdue go out 30 days before the one-year date, plus a processing safety window, so removal stays on time. Organizers must be told the actual access/export cutoff; it must not imply that personal data stays available after processing starts. The 30 days start when the email provider accepts the notice. A bounced email, not downloading an export or a changed subscription does not extend retention.

Events already overdue at activation. No automatic removal ran before this feature is activated, so some events will already be more than one year past their end date. They receive the same notice and 30-day export window and are removed after it, as the Data Processing Agreement states. The data is not used for anything else during that window, and an organizer can ask for earlier deletion. Required data-return or deletion assistance is not denied solely because a subscription has ended.

Internal maintenance and activation safeguards​

The current maintenance path is restricted to internal database operators. It is not a background job or a new support-console action. An authorized operational rollout must check the event's cutoff before freezing it, review the aggregate candidate, publish the archive, then run bounded removal batches and verify that all in-scope records are gone. Operators must set a positive execution timeout of at most five minutes before each maintenance invocation; the routines reject unbounded calls and use a two-second lock wait limit. Operators must inspect progress and errors between batches. Installing the routines alone does not provide scheduling, monitoring or retries.

Once an event is frozen, guarded personal-data reads, exports and new effects stop. Already running guarded work completes before freeze obtains its lock, and database fences prevent new attendee-level records being added afterwards. Archive-aware reports use the preserved results. Content already loaded into a browser, downloaded or accepted by another provider cannot be recalled by that lock.

Publication builds the archive from the frozen event rather than accepting a supplied report. If it finds malformed feedback aggregates, non-opaque choice keys or invalid ticket configuration, it records a review failure without publishing or removing the source data. That is an unfinished case requiring resolution, not evidence that the event is anonymous or that retention has completed. The list of due events skips failed events and events waiting in retry backoff, and the routines require a UTC session time zone.

Locks, AI analysis and frozen events​

Public registration takes a shared event lock plus a lock per event and normalized email, so check-ins and other registrations are not serialized. Mail delivery and exports still hold the shared lock through provider acceptance, bounded by the 30-second email-provider abort.

AI feedback analysis is an exception to that drain (ADR 0048). It loads anonymized input in a short guarded transaction, calls the model with no transaction open, and re-checks retention before storing the result. Freeze does not wait for an in-flight AI call because its input is anonymized and the provider is an EU zero-retention provider. A late result is discarded and no report is written after freeze. AI usage and cost rows commit per request. Freeze marks queued and in-flight runs as failed, and removal later deletes them.

After freeze, organizers can still edit an event's name, description, location, language and custom field definitions. Dates, team and owner are locked. Deleting a user or a logo asset still works, because those references are cleared rather than blocked. A blocked write returns HTTP 409 (REST) or PRECONDITION_FAILED (tRPC) with the message "This event's attendee data is frozen for retention and can no longer be changed."

Before automatic processing can be activated, CheckInOS still needs:

  • Advance-notice delivery and authenticated export orchestration with announced cutoffs.
  • A reviewed handling path for events that fail privacy review and already-overdue events.
  • Bounded scheduling, monitoring, retries and completion checks under realistic load.
  • A previous supported rollback release that understands archives and the freeze boundary.
  • Agreed provider-copy and separately justified retention procedures. Database backups already rotate after 30 days and replay erasures on restore.

What removal does not mean​

  • Deleting names alone is not established anonymization. Original attendee IDs can be linked to old exports or tickets. The preserved archive must not retain that individual history under an anonymous label.
  • An export is a separate copy. An organizer that downloads attendee data remains responsible for its lawful use, security and retention. A copy already downloaded or delivered to another provider is not erased by removing the application's source rows.
  • Group reports are not automatically anonymous. Rare groups and combinations of report filters still need identification-risk review.
  • Some records have a separate purpose. Minimum records required for billing or another justified legal purpose need their own access and retention rules; they do not justify keeping the entire guest list for analytics.
  • Backup copies expire on their own schedule. Live-data removal does not erase older copies. The new EU encrypted-backup configuration schedules lifecycle deletion after 30 days; physical deletion is asynchronous. Legacy GitLab snapshots have separate, not-yet-verified expiry settings. Applicable deletion instructions and due retention are reviewed and re-applied before restored data is used, not just filtered by backup date. Copies held by other providers follow those providers' own retention.

Backup schedule activation​

The encrypted-backup implementation is deployed, but its daily schedule remains inactive pending a follow-up pipeline change. That change selects backups with the validated GitLab input pipeline-purpose=backup, not a schedule variable; it preserves the project-wide ban on pipeline-variable overrides. Only a default-branch scheduled run can use the backup path; it cannot build, migrate or deploy the application. First daily-backup, real-key recovery and live monitoring verification remain operational rollout gates.

Automatic records; manual rights handling​

Dashboard event/team deletions write an identifier-only ledger record atomically with the successful deletion and try to publish it to the independent Superthread ledger immediately. The public data-deletion form creates a request-reference card in "Received — verifying"; the person's details remain in the support email. Missed publications are reconciled from durable entries by subsequent backup runs. A provider outage does not turn a deleted event into an unrecorded successful operation. Losing the live database before an unpublished entry is reconciled can still lose evidence; restore operators must resolve those gaps.

Identity checks, deciding an erasure's scope, provider follow-up and executing rights requests remain manual. A request card does not itself delete data. This release does not make individual-attendee soft deletion into full erasure.

Scheduling and support visibility​

The planned processing uses PostgreSQL pg_cron to schedule database maintenance. Supabase is the current database host, but the core archive/removal procedure uses standard PostgreSQL rather than requiring Supabase-specific functions. The existing application email worker is responsible for sending notifications.

Internal retention records track the cutoff, processing phase, progress counts and completion. Notice outcomes and a support view of scheduled, overdue and failed work remain part of the planned rollout. A dedicated CheckInOS staff administration interface is planned separately; this release does not add that console or give staff new customer-data access.

For related guidance, see Analytics & Reports, Attendee Management and Event Feedback. The Data Processing Agreement and Privacy Policy describe the contractual policy and current processing disclosures.